Files
audio-synth/dev/general/MainSys/Project Logs for MainSys/MAIN PCB ECO 26.12.2025 23-44-32.LOG
Erik Tóth c661422a10 PCB WIP 2
All routing done, ready for review regarding the schematics, still have to do some silk screens...
2025-12-27 01:02:47 +01:00

3 lines
266 B
Plaintext

Change Physical Footprint: Designator=D1 Old Footprint=X1-DFN1006-2_L1.0-W0.6-P0.65-BI New Footprint=X1-DFN1006-2_L1.0-W0.6-P0.65-BI
Change Physical Footprint: Designator=D2 Old Footprint=X1-DFN1006-2_L1.0-W0.6-P0.65-BI New Footprint=X1-DFN1006-2_L1.0-W0.6-P0.65-BI